A lot of progress has been made yesterday with good attendance. Me and my dad Bob built the studding for the new partition wall which will separate the museum/information centre from the shop. This is part of the refurbishment of the VSOE building.
| (Above) The frame of the new partition wall |
Also in the afternoon, a majority of us helped David slide a new tarpaulin onto his Maunsell coach after two attempts.
| (Above) David, Geoff and Bob pulling hard |
Trevor and Geoff fitted two new PC monitors for the GBLV office.
It is anticipated that Bridge 1 will be lifted in place in about a week or two. I'm just eager to walk over the bridges straight to Northbridge Street.
Looks Good Jack.... Keep it up. And can you ensure the photos are located in the photo library.
ReplyDeleteTks
Trevor