22 March - SG
Arrived today to find the new (secondhand) prefab toilet blocks have been delivered, one large and one small. We inspected these inside - they're not too bad but will need some work to spruce up and sort out the flooring. We removed algae from the outside and flaking paint - first job will probably to perk up the outsides to make them more presentable once installed. Meanwhile the tramways club have begun dismantling the protective structure over the tram bodies, so that these can be readied for the move.